EMU and CSR Shop Improvements (Project No. 300-0137)

This project includes renovation of the existing Electrical Multiple Unit (EMU) and the Critical System Replacement (CSR) Shops to meet the current State Building Code, improve the working environment in the shops and offices, enhance safety, and extend the life of the buildings. The renovation includes installation of fire detection and alarm systems, railings, ADA access, emergency lighting, and HVAC improvements. The renovations are mainly interior work with some minor exterior work to install exterior lighting and equipment pads.

Click on the images below for full-size photos of the EMU and CSR buildings.

EMU Facility - link to large imageThumbnail image linking to large EMU&CSR Photo

 

PLEASE NOTE: Prospective bidders for the New Haven Rail Yard projects must have experience in heavy rail and rail facility construction and MUST BE PREQUALIFIED with the State of Connecticut to submit a bid. Information on prequalification can be obtained by following the "Pre-Qualify" link on the menu tab above.

Adobe Reader logo