Yard Signal System (Project No. 0301-0129)

This project installs a yard signal system (similar to the system in place for the 60’s Yard) to control the many switches in the yard between the West End Yard and the main line to improve operating efficiency, increase safety, and decrease crew costs.


PLEASE NOTE: Prospective bidders for the New Haven Rail Yard projects must have experience in heavy rail and rail facility construction and MUST BE PREQUALIFIED with the State of Connecticut to submit a bid. Information on prequalification can be obtained by following the "Pre-Qualify" link on the menu tab above.

Adobe Reader Logo